My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE51379
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE51379
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:55:29 PM
Creation date
11/20/2007 2:52:26 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983035
IBM Index Class Name
Permit File
Doc Date
4/20/1983
Doc Name
TERRA CONSTRUCTION INC VOLLMER PIT FN 83-35
From
MLR
To
RINDAHL & ASSOCIATES
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.-_ ~ <br />c ~II ~I~~I~~I~~~~~ ~I~ IE SOUNCESDOm. Gnvmno~ ~ • ' <br />~ 999 <br />D. Monte rascoe, cnecu ~~.~ ...rector <br />1.ll lLL ,1LI® ~Jl~l.® YLL L_I~LJI Ylrll[YrYY®~ <br />423 Centen nlal Building, 1313 Sherman Street <br />Denver, Colorado 80203 Tel. (303) 866-3567 <br />David C. Shelton <br />Director <br />April 20, 1983 <br />Mr. Gilbert F. Rindahl <br />Rindahl and Associates <br />2305 South Syracuse 4Jay <br />Suite 217 <br />Denver, Colorado 80231 <br />RE: Terra Construction Inc. - "Vollmer Pit" <br />File No. 83-35 <br />:";r:(r: <br />Dear -F1r :-R}: <br />I have received and reviewed your response to my adequacy letter of <br />March 21, 1983. Some of the matters I mentioned are not yet clear. <br />Many have been resolved, however. I will ask further clarification <br />questions on those matters that are not yet resolved, using the Exhibit <br />letter and question number designations from my original letter. Please <br />respond to these remaining questions as soon as possible to facilitate <br />Board consideration of the application during the scheduled April 27-28, <br />1983 meeting. <br />Exhibit C <br />3. The reclamation of the topsoil stockpile areas is still not clear. <br />Your reclamation plan calls fora phased mining and reclamation plan. <br />( / However, these topsoil berm areas will remain as moderate disturbance <br />/X\ throughout the life of the mine and may necessitate redisturbance of <br />previously reclaimed adjacent areas (to produce an overall smooth <br />grade). Reclamation costs for grading and revegetating these areas <br />should be included in Exhibit L. <br />6. Since the weathered sandstone is about 40' deep and a 25' layer is to <br />/// be mined, it seems that the weathered material is not to be mined <br />F! down to unweathered sandstone, but merely to the selected depth. <br />This is probably a good idea from a reclamation point of view. Is <br />this the case? <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.