Laserfiche WebLink
• The crusher facility, coal stockpile and coal handling <br />operations could potentially contribute pollutants <br />(air-born coal fines) to the stormwater. <br />c. Preventive Maintenance: Preventive maintenance is <br />required in the following areas: <br />1) Surface moisture content of the stockpiled coal <br />will be maintained to prevent visible emissions <br />from the stockpile. <br />2) Unpaved haul and access roads on site will be <br />watered to maintain adequate surface moisture <br />content. <br />3) Mud, dirt and coal deposited on paved roads will <br />be cleaned daily or as required using a water <br />truck or other means. <br />4) Water spray bars must be operated and maintained <br />on all crushing and conveying equipment as <br />required to minimized dust generation. <br />5) if rills occur, in those areas where vegetation is <br />used as the primary sediment control feature for <br />stormwater runoff, they will be repaired. Any <br />• damage to vegetation will be reseeded and mulched <br />if necessary. <br />6) Sediment must be periodically removed from the <br />sediment fences in the areas where a sediment <br />fence is the primary sediment control feature for <br />stormwater runoff. <br />7) The oil absorber in the west yard will be cleaned <br />or replaced when necessary. <br />d. Good Housekeeping: The good housekeeping requirement <br />for this plan consists of performing the required <br />preventive maintenance as follows: <br />1) Maintain water sprays and surface moisture on coal <br />piles and site roads. <br />2) Cleaning the paved haul road as necessary. <br />3) Maintaining sediment fences and repairing rills <br />and gullies. <br />4) Clean or replace oil absorber in west yard. <br />e. Spill Prevention and Response Procedures: There are no <br />6 <br />