Laserfiche WebLink
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Date : 04-Apr-2006 Permit or job no. <br />User : WHE Abbreviation <br />Filename <br />M-2006-009 Site :Hindmarsh Sandstone <br />none <br />M009-000 <br />Agency or organization name :DMG <br />Permit or job action : i 12c application review final <br />TASK LIST (DIRECT COSTSI <br />NO. TASK DESCRIPTION FORM <br />USED FLEET <br />SIZE TASK <br />HOURS DIRECT <br />COST <br /> <br />001 -Demolish mine related structures demolish 1 4.0 $349 <br /> <br />002 -Scale highwall for loose rock excavate 1 3.6 $200 <br /> <br />003 -Construct 3 foot earthen berm along edge of pit excavate 1 10, 6 $1,161 <br /> <br />004 -Rip & grade 3 acres, replace soil to suppoK revegetation I dozer I 32.01 $6,445 <br /> <br />005 -Revegetate 4 acres affected area revege 1 4.0 ' $4,997 <br /> <br />006 -Haul reclamation equipment to and from job site mobilize 5 2.5 $1,361 <br /> <br />007 -Construct 1000 feet of safety fence at $2.38/LnFt NA 1 24.0 $2, 380 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />CI ICTr1TRIC O/1 !1 C1C 0(1 •] <br />includes inFlation factor adjustment of <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT <br />NA <br />State :Colorado <br />County :Montezuma <br />TOTAL DIRECT COST <br />Liability insurance : 2.02 % of direct total = $341 <br />Performance bond : 1.05 % of direct total = $177 <br />Job superintendent : NA` NA NA total = NA <br />Profit: 10.00 %ofdirect total= $1,689 <br />'not required (or eqp. operator serves as super.) TOTAL O & P = $2,208 <br />LEGAL-ENGINEERING •PROJECT MANAGEMENT- CONTRACT AMOUNT (direct+O&P)= $19,101 <br />Financial warranty processing (legal/related costs} ; total = <br />Engineering work and/or contract/bid preparation ; NA NA NA total = NA <br />Reclamation management and/or administration : _ <br />5.00 % of cntr. NA total = $955 <br />CONTINGENCY • NA` NA total = NA <br />'contingencies accounted ror of task level TOTAL INDIRECT COST = $3,163 <br />TOTAL BOND AMOUNT (direct + indirect) _ $20,056 <br />