Laserfiche WebLink
<br /> <br />COAL COMPANY QUARTERLY POND INSPECTION REPORT <br />Inspector Name: LA/1/1 / /2Crc,(~ Date: 7' Z~ - 9 9 <br /> <br />Pond Number: Date Last Inspection: 9.2 2.99 <br /> <br />Site Name: if /- /)ic/iv< ~.o,rt ,Tu-„o Quarter: %`,./[o~ J~ <br /> ~ <br />1. Design Depth Measured From Spillway Invert . <br />2. Design Maximum Sediment Level Measured From Spillway Invert <br />3. Sediment Level/Pond Bottom Measured From Spillway Invert . <br />4. Water Level Measured From Spillway Invert <br />5. Discharge Through Spillway Since Last Inspection . <br />6. Rills and Gullies <br />7. Vegetation Adequate <br />8. Outlet Channel Erosion . <br />9. Animal Burrows <br />10. Cracks . <br />11. Seepage <br />12. Spillway Clogged , <br />13. Valves Operational <br />• A/d <br /> AIA <br /> ~ <br />///N <br /> <br />~t/9. Yes y No <br />. _ Yes _~ No <br />. ~ Yes No <br />~/A~ Yes No <br />. Yes ~Y_ No <br />. _ Yes X No <br />. Yes _~ No <br />t!A. Yes No <br />V~. Yes No <br />ADDITIONAL COMMENTS:~wc.~ <br />MAINTENANCE REQUIRED: ~vu-/< <br />- - ¢ f <br />~W o~ G <br />3 ~ q° <br /> gP/LGWAY INV! <br />- ~--- <br />' <br />Z v~ p ~ Z <br /> o ~ n ~ n <br />h <br />~ W <br />i~ h" H ~1 <br />