Laserfiche WebLink
<br />COAL COMPANY QUARTERLY POND INSPECTION REPORT <br />Inspector Name: CAQR~/ ~esa~,C'Q Date: 7- 26.99 <br />Pond Number: Date Last Inspection: 9.2 2-94 <br />Site Name: NtL fewge{ Lo~ee.v/ Quarter: ~~~ ~¢ <br />1. Design Depth Measured From Spillway Invert . <br />2. Design Maximum Sediment Level Measured From Spillway Invert <br />3. Sediment Level/Pond Bottom Measured From Spillway Invert . <br />4. Water Level Measured From Spillway Invert <br />5. Discharge Through Spillway Since Last Inspection . <br />6. Rills and Gullies <br />7. Vegetation Adequate <br />8. Outlet Channel Erosion . <br />9. Animal Burrows . <br />10. Cracks <br />11. Seepage <br />12. Spillway Clogged . <br />13. Valves Operational <br />tiq <br />/!/? : Yes No <br />. Yes ~ No <br />. ~ Yes No <br />Nt¢ Yes No <br />. Yes K No <br />. Yes k No <br />. Yes ~ No <br />. Yes ~ No <br />VA. Yes No <br />ADDITIONAL COMMENTS: No.~[ <br />MAINTENANCE REQUIRED: eaI <br />- - 4 - F - <br />W W 0 ~ C <br />n <br />3 ~ 0.~ <br />SP/ttWAY SNVE <br />- ~--- - <br />3 ~ 2 ~ ~ ti <br />W W ~ W W <br />~4h~ A ~~1 <br />