Item 22 - List the ouifall, latihrh and longitude for each ouifa0location and the receiving waters. This infomtation is vital for the Divisan=s new
<br />infomrmion data system. Please htdicate whether latitude and bngihrde were determined through use of a Gbbal Positioning System device,
<br />through mapping caordmates or an estimate m other potentially less accurate method.
<br />Ilern 23 - if the facility generates domestic wastewater from sinks, toiiets andlor showers, please complete this item. indicate the source(s) of such
<br />wastewater, what treatment es provided and what method of disposal is ut0¢ed (surface discharge, leach field, etc.). Also, if sludge or other sofid
<br />waste is generated from these activitles - descn'be the source(s), how often h is disposed o$ the uhimale disposal site and any other pertinent
<br />information.
<br />Items 24, 25, 27 -Self explanatory.
<br />hem 26, 28 These items requite monitoring for various pollutants With the exception of item 26 all analyses should be done onty at
<br />and 29 - outfalls that ate not soley made up of stormwater and domestic wastewater. )n item 26, analysis for the indicated parameters shall be performed
<br />on each outfall and receiving waters immediately upstream of the outfall If mote than one outfah is [o a common body of water, onty one
<br />analysis of the receiving water upstream of the upper-most outfall will be requited >f the receiving stream is dry during portions of [he year, so
<br />indicate. Tn the rase of sed'mrentatbn ponds for stotmwater rufmfE; one oulfall can be sampled it' it can reasonably be assumed to be
<br />representative of all sedimentation pond outfa8s.
<br />For item 28, the WET testing shall be conducted on 100%effhren[ and 6e for both Ceriodanhnis dubia and fathead minnows. This
<br />requirement is waived where roo8oe testing a currently required. The test shall 6e an acute test unless the ratio of stream tow flow m
<br />etlluen[ design tbw is less than 10:1, respectively, and the receiving stream has a Class 1 Aquatic Life Use m CIasS 2 Aquatic Life Use will all
<br />the appropriate aquatic life numeric standards. In tire latter case a chronic test is requhed. The Division reserves the tight [o request additional
<br />WET testing as part of the application review. If so requved, the permit will not be processed until the additional nformatbn is submitted
<br />WET testing procedures are descdbedm the Guidelmes for Conductitre Whole Effluent Toxicity Tests which tan be obtained from the'
<br />Division For item 29, a priority po0trtmtt stern is requ'ved unless the probable total annual production is less than 100,000 tons per year. The
<br />parameters for the appropriate GC/MS fraction(s) are shown in Appendbt A
<br />For all three items, effluent samples and all ins[ream samples tan be grab samples Include the sampling date and the name of the laboratory
<br />performing the analyses. When quantitative data for a pollutant are requited, the apphtartt must collect a sample of effluent and analyze it for the
<br />pollutmt in accordance with analytical methods approved under 40 CFR Part 136. When no analytical method is approved the applicant may
<br />use any satiable method but must provide a n of the method The Divisbrr may albw or establish appropriale Bite-specific sampling
<br />procedures or requirements, brcluding sampl"vtg bcations, the season itr which the samplitrg takes place, protocols for collecmtg samples and
<br />additional time for submitting data on acase-bya~sse basis.
<br />I1' 7S RECOMMENDED THAT YOU CONTACT AN ANALYTICAL LABORATORY PRIOR TO SAMPLING AND
<br />ANALYSIS SO THAT PROPER PROCEDURES ARE FOLLOWED.
<br />If this a an application for renewal, reduced sampling may be appropriate, contact the Permits Unh at (303) 692-3500. U there a oo effluent
<br />and/or teceiving water m analya, iodieate this. -
<br />Item 30 - The apphcant must review Appendices A and B and must indicale whether it knows or has reason m 6elkwe that any of the po0umnts listed ate
<br />present m the discharge. The Division may waive the reporting tequvrements for individual pointsources it'the appficmd has demonstraad that
<br />such a waiver is appropriate because information atkquale ro support issuance of a permh tit be obtained with less stringent requitetnents.
<br />Each applicant must report quantimtive [late for each outfall containhtg process wastewater with the folbwing exceptions:
<br />a) For every pollutant discharged which s not so limited in an effluent limitations guidelitte, the apphtartt must either report quantitative data
<br />or brlefly desarbe [he reasons the pollutant is expected [o be discharged
<br />b) For every pollutant expected to be discharged in concentrations of 10 ~ or greater the apphtetnt must report quantitative data For
<br />acnolevr, acrybnitrile, 2,4 dmiuophenol, and 2-methyl-4,6 d'minophenol, where any of these four pollutants are expected to be discharged
<br />m continuations of l00 Qrg/P or greater the applicant must report qualitative data For every pollutant expected to be discharged in
<br />concentratons less than 10 ~g/P, or in the case of acrokin, acrylonitrile, 2,4 dinitraphenol, and 2-methyl-4,6 dmitrophenol, in
<br />concentrations less than 100 Qrg/P, the applicant must either submit quantitative data or briefly destxrbe the reasons the pollutant is
<br />expected to be dischazged.
<br />c) The appliterrt need not provide quantitative data if the pollutant is present rtr the discharge solely as the tesuh of its presence in intake
<br />water However, the applicant muss report such pohutanf as present
<br />Item 31 - Please submit a copy of summaries of all water quality data perfomtedm the previous five years under conditions of the permit hom the
<br />Colorado Divison of Mitremis and Geology. Such monitoring is often submitted as part of the annual report to CDMG and may consist of both
<br />ouffall sampling andmstream samplitrg. If such monitoring is not requited, pk~.se so state.
<br />hem 32,33 -Self Explanatory.
<br />item 34 - Desrn'be those measures taken to control pollutants fiom entering wastewater streams. Do not include items which are tktaikd'm the facility+s
<br />SWrmwater Management Plaa
<br />Item 35,36 - Self explanatory
<br />
|