Laserfiche WebLink
• Pond 9-PS <br />The embankments were in good condition. No signs of distress or movement in the downstream or upstream faces <br />of the embankments. Pond was dry. Crest width is 8'; embankment height is approximately 2 to 4 ; downstream <br />face at 2.5:1 (H: V) and upstream face at 2.5:1 (H: V) configurations. <br />Pond 9-P6 <br />The embankments were in good condition, No signs of distress or movement in the downstream or upsn'eam faces <br />of the embankments. Pond was dry. Crest width is 20'; embankment height is approximately 4'; downstream face at <br />2.5:1 (H: V) and upstream face at 2.5:1 (H:V) configurations. Some rodent burrow holes observed in downstream <br />face of embankments. <br />Pond 9-P7 <br />The embankments were in good condition. No signs of distress or movement in the downstream or upstream faces <br />of the embankments. Pond was dry. Crest width is ] 0 ;embankment height is approximately 4 ;downstream face at <br />3: ] (H: V) and upstream face a[ 2: I (H: V) configurations. <br />Pond 9-P8 <br />_ The embankments were in good condition. No signs of distress or movement in the downstream or upstream faces <br />of the embankments. Pond was dry. Crest width is 9; embankment height is approximately 7 to 8; dawnstream <br />face at 3:1 (H: V) and upstr~epam~,fµacte at 2:1 (H: V) configurations. <br />Pond 9A-P1 ~ /r ~~ ~~ <br />The embankments were in good condition. No signs of distress or movement in the downstream or upstream faces <br />~, 3 ~s'~ ~ of the embankments. Approximately 6 inches of standing water in base of pond. Crest width is 24 ;embankment <br />~,.~ height is approximately 11 ;downstream face at 2:1 (H:V) and upstream face at 1.5:1 (H: V) configurations. No <br />seepage observed at toe of embankments, however some willows observed in these areas. <br />Pond 9A-P2 <br />The embankments were in good condition. No signs of distress or movement in the downstream or upstream faces <br />of the embankments. Pond was dry. Crest width is 9 ;embankment height is approximately 7; downstream face at <br />2:1 (H:V) and upstream face at 3:1 (H:V) configurations. <br />Pond 9A-P3 <br />The embankments were in good condition. No signs of distress or movement in the downstream or upstream faces <br />of the embankments. Pond was dry. Crest width is 9 ;embankment height is approximately 10 ;downstream face at <br />• 3:1 (H:V) and upstream face at 2:l (H:V) configurations. <br />Job Number: 014857 NWCC, Inc. Page 3 <br />