Laserfiche WebLink
I~ L ,(,~ Pond SA-PI <br />~ ~ The embankments were in good condition. No signs of disress or movement in the downstream or upstream faces <br />of the embankments. Pond was dry. Crest width is 10 to 12'; embankment height is approximately 10 ;downstream <br />face at 3: I (H:V) and upstream face at 2: t (H: V) configurations. <br />Pond HR-PI <br />~ The embankments were in good condition. No signs of distress or movement in the downstream or upstream faces <br />,3 ~ ID ~~ , of the embankment. Approximately 1 to 3 feet of standing water in base of south pond. An interior <br />,; ~ dikelembankment was constructed in center of pond, which was not shown on as-built drawings. Crest width is 8- <br />10; embankment height is approximately 10; downstream face at 2:1 (H:V) and upstream face at 2:l (H:V) <br />configurations. Numerous dead and living cottonwood trees observed in eastern side of pond bottom. <br />Pond 9-Pl <br />%~ t' The embankments were in good condition. No signs of distress or movement in the downstream or upstream faces <br />of the embankment. The pond was dry and some sediment was observed in the base of the pond. Crest width is 18 <br />to 20'; embankment height is approximately 3 fo 5'; downstream face at 4:1 (H:V) and upstream face at 2.5:1 (H:V) <br />configurations. <br />• <br />l .yl~~.~Sf <br />Z ,~ <br /> <br />Pond 9-P2 <br />The embankments were in good condition. No signs of distress or movement in the downstream or upstream faces <br />of the embankment. The pond was full and water was flowing through the spillway. Three (3) feet of freeboard was <br />measured. Some rodent burrow holes observed in downstream face of embatkments. No seepage or wet areas <br />observed along downstream faces or toe of embankments. Crest width is 11 to 12 ; embankment height is <br />approximately ] 0 ;downstream face at 2.5:1 (H: V) and upstream face at 2:1 (H: V) configurations. <br />Pond 9-P3 <br />The embankments were in good condition. No signs of distress or movement in the downstream or upstream faces <br />of the embankment. The pond was full and water was flowing through the spillway. Three (3) feet of freeboard was <br />measured. Some rodent burrow holes observed m downstream face of embankments. No seepage or wet areas <br />observed along downstream faces or toe of embankments. Crest width is 8 to 10 ; embankment height is <br />approximately 8 ;downstream face at 2: l (H: V) and upstream face at 2: I (H: V) configurations. <br />Pond 9-P4 <br />The embankments were in good condition. No signs of distress or movement in the downstream or upstream faces <br />of the embankments. Pond was dry. Crest width is 8'; embankment height is approximately 2 to 3 ;downstream <br />face at 2.5:1 (H:V) and upstream face at 2.5:1 (H:V) configurations. Some rodent burrow holes observed in <br />downstream face of embankments. <br />Job Number: 014857 NWCC, Inc. Page 2 <br />