My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE51112
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE51112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:55:21 PM
Creation date
11/20/2007 2:45:25 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
SEDIMENTATION STRUCTURE 006 AND PRE SETTLING BASIN PHASE IV DESIGN
Section_Exhibit Name
TAB 13 ATTACHMENT 13-4C
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Outfall Slope 15H <br />D50 Size 1.25 feet <br />Invert Eleva [ion 7075.5 <br />25-year, 24-hour Peak Stage 7077.9 <br />Pre-Set[ling Rasin - FHASE IV <br />Eme [q ency SFillway: <br />T}P°- Trapezoidal Channel <br />B~:2 tom 41id[h 1G feet <br />Lengch 20 fee[ <br />Side Slopes 3H:1V <br />glut fa 11 Sl~~pe 3-.54 <br />D50 3i.e 0.7.5 feet <br />In1e[ El e'/a[ion 7116.0 <br />25-year, °4-hour Fea l: Stage 711P.G <br /> Summary <br /> With the phase IV design sediment pond UG6's capacity is attributed entirely to the <br />• emban 4.ment. Du ri nq passage of tt~e 10-year, ''?4-hour storm [he spillway does not discharge <br /> s edimeni downstream not is there any fl cw through the emergency spillway. The pond will <br /> be a l.e rma nent sr. ru cture after mining and therefore will need to be redesigned later on <br /> to safely pass the flow from the 100-year, 24-hour precipitation event. Th=_ embankment <br /> is cens[ruct ed [~~ be stable and provide adequate freeboard. Therefore, based on [he <br /> design, this structure complies with the app rcpriate regulations fc•r a sedimentation <br /> structure. <br />The Pre-Settling Basin is a temporary structure whi r_h will Ge reclaimed once reclamation <br />activi[i es ct the mine area have progressed far enough so that it is no longer required. <br />Friut tc reclamation of the Pre-Settling Basin, Seneca will demo ns[rate Chat this basin <br />is no longer required. Seneca Cual company will pe ricdically inspect both of these <br />st[uc[ures for sediment storage, structu cal integrity and ha za rdeus conditions. <br />Maintenance and remedial wort: will be pe [formed in accordance with the approved mine <br />permit. <br />• <br />9 Revised 03/02/98 <br />
The URL can be used to link to this page
Your browser does not support the video tag.