My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE51112
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE51112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:55:21 PM
Creation date
11/20/2007 2:45:25 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1982057
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Doc Name
SEDIMENTATION STRUCTURE 006 AND PRE SETTLING BASIN PHASE IV DESIGN
Section_Exhibit Name
TAB 13 ATTACHMENT 13-4C
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
104
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Spillways <br />Sediment Pond 005 has two separate spillways; a principal avid an eme rgency. Please see <br />ExhiGit 13-5B for location and design of spillways. The principal spillway consists of a <br />2a" diameter drop inlet co ri ugatrd metal p1 E.e !CI-0FI with trash screen. t4aximum elevation <br />(peak stage) with the Fa sage of the 10-year, V-ho ui even[ wi 11 be %0"15.9, [his Leaves <br />0.1 feet tc [he eme rg en,:y spillwcy crest. <br />The ems rq ency spillway for pond OU6 consists of n prapped [ra pe roidal charms). Assuming <br />the principal spillway pipe was pl~lgged, and the Fre-SeLiling Basin was bypassed, the <br />trap=_-~•idal channel could safely pass the runoff '/ol urn= fi~~m [he LS-y =a r, '.'.4-hour st arm. <br />Feat stage e1e'/ati~n with the passage of the ~5ryea~ sic•rm is "101. 9, this leaves 2.1 <br />feet of freeboard to [he [op of emGenkment. <br />The Fre-Settling Basin has one spillway which consists cf a riprapped irape.c idal <br />channel. The [raF~F ZO idal channel cou bi safe l}' I•ass the runoff volume from the 25-year, <br />?4-hour storm. Peak stage elevat u•n 'with the passage of the -5-year storm is n118. 6, <br />this leave; l.a fee[ of iieeboa rd t~• the crest of the Ga sin. Please refer to Addendum 1 <br />for caua•:ities of both spillways during passage of the 10 and S-year storm events. <br />Table 13-a r-_a and Addendum [ prssen[s the desi•3n ~--a lculan nns for the prima pal and Goth <br />emergency spillway. <br />TI-.B LE 13-4C-a <br />F'FIIICI FA.L FtID EMEFGEIIC'i SE'I LLWAi DAT F. SlJ lil-1AF'i <br />Pend 005 - F'HASE IV <br />Principal S1•i ilwa y: <br />Type <br />In1e[ Elevation <br />Length <br />Diameter <br />Slope <br />lU-yea[, 24-bout Peak Stage <br />Emergency Spillway: <br />Typ=_ <br />B~LLGm WidCh <br />Length <br />Side Slopes <br />Dr~•p inlet ICI-0FI <br />7fJ71.5 <br />150 feet <br />[9 inches <br />d . i18 <br />~o~s.a <br />Traps z~~idal Channel <br />15 feel <br />50 feet <br />3H:lV <br />8 Feciscd n3/02/98 <br />• <br />• <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.