My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE51040
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE51040
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:55:19 PM
Creation date
11/20/2007 2:44:05 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981020A
IBM Index Class Name
Permit File
Doc Date
5/13/2002
Section_Exhibit Name
Appendix H MSHA Plans Deleted from Current Permit
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
115
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~• FAN STOPPAGE PLAN <br />In order to comply with Section 75.321, 30 CFR 75, and to insure <br />the safety of the workmen in case of discontinuity of a main fan, <br />the following plan is hereby adopted: <br />1. LJhen a fan stoppage occurs, the official in charge of <br />underground operations will be notified promptly, and <br />cormunications will be maintained during the interruption. <br />2. In the event of a fan stoppage, all men will be withdrawn <br />from the working section, and all power will be deenergized <br />i~~~ediately. <br />3. If the interruption is for less than 15 minutes, working <br />places and other active workings where m=thane is likely <br />to accumulate are re-examined by a certified person to <br />determine if methane in amounts of 1.0 volume per centum <br />or more exists therein. <br />4. if the fan is not started within 15 minutes, all men will <br />C• be withdrawn from the mine and any electric power used in <br />the mine will be cut off within 30 minutes of the fan <br />stoppage. -- <br />5. Upon restoration of the ventilation and after the fan has <br />been in operation for at least 15 minutes with a normal <br />water gauge, an examination will be made of the entire <br />mine, .conducted in accordance with the regular _p re-shift <br />examination, before the men are permitted to re-enter the <br />mine and before any power lines leading underground are <br />energized. <br />~" <br />Submitted B ~ ~ ~ ~ - - <br />Date <br />_ Black Hawk Coal Company <br />Company <br />McClane Canyon Test Site ~1 <br />Fiine Name <br />05-03013 <br />(MSHA I.D. No. <br />
The URL can be used to link to this page
Your browser does not support the video tag.