My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE51005
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE51005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:55:17 PM
Creation date
11/20/2007 2:43:28 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981040
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
RULE 2.05 OPERATION AND RECLAMATION PLANS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Sedimentation Pond <br />The sedimentation pond for the planned surface support facilities area <br />is shown on the Drainage and Sediment Control Plan Map (Map 6). The <br />design of this sediment pond is included in the Section known as Ponds, <br />Impoundments and Diversions, found in Section 2.05.3. <br />~/~--~-- <br />Construction of the sediment pond will be conducted in the near future. <br />Exhaust Fan <br />An exhaust fan will be located on the portal pad of the Peacock Portals <br />area. This fan will be used to provide ventilation for the underground <br />mine workings. <br />Access Roads <br />• The planned access road for Peacock Portals, is shown on the Drainage <br />and Sediment Control Plan hlap (Map 6). <br />Ponds. Impoundments, and Diversions <br />To control runoff and protection surface water quality, Sunbelt will <br />construct several diversion ditches and a sedimentation pond. The <br />Drainage and Sediment Control Plan Map (Map 6) shows the location of the <br />sediment pond and diversion structures. The designs and specifications <br />are presented in Exhibit 11, Drainage and Sediment Control Plan. <br />A theoretical detention time of 24 hours has been used in the design of <br />the sedimentation pond so that all runoff occurring as a result of the <br />10-year, 24-hour precipitation event will be treated to produce a total <br />of suspended solids (TSS) concentration less than or equal to 30 <br />milligrams per liter. The pond is designed to provide storage far the <br />inflow entering the pond as a result of a 10-year, 24-hour precipitation <br />. event. <br />2.05-17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.