My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE51005
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE51005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:55:17 PM
Creation date
11/20/2007 2:43:28 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981040
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
RULE 2.05 OPERATION AND RECLAMATION PLANS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
`~ All mining equipment or operational areas which are subject to large <br />concentrations of dust will be equipped with water sprayers at the <br />source to keep airborne dust to a minimum. Adequate ventilation will be <br />provided to each working face to quickly move dust particles during the <br />course of mining. The mine operation will comply with MSHA rules and <br />regulations to keep respirable dust to a minimum. Sampling will be done <br />as outlined by MSHA. <br />Operation Description <br />A detailed narrative description of the land to be affected within the <br />permit area and the planned mining activities is provided under the <br />heading Production Methods and Equipment. The mining plan is <br />graphically portrayed on the Mine Plan Map (Map 8). The portal areas <br />and other surface support facilities to be affected by the planned mine <br />operation are shown on the Drainage aRd Sediment Control Plan Map (Map <br />6). <br /> <br />As described earlier, Sunbelt will be utilizing a room and pillar method <br />of underground mining. The surface area necessary to facilitate <br />underground mining will be less than 7 acres. The extent of underground <br />workings will be on the order of approximately 10 acres per year for <br />50,000 tons annual average production. <br />Mine Facilities <br />The underground mining operations to be conducted by Sunbelt will <br />include the following surface support structures: Office ;• Shop; Coal <br />Crushing, Handling and Loadout Facility; Transformer and Utility Lines; <br />Sedimentation Pond; Exhaust Fan; and Access Road. <br />Office and Sh <br />Sunbelt will maintain an office and shop at the planned operation as <br />. shown on the Drainage and Sediment Control Plan Map (Map 6). <br />2.05-15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.