Laserfiche WebLink
Reclamation Sched ul inq <br />Action Taken <br />Bonds procured <br />Time Period <br />Prior to mine disturbance <br />Sediment Control <br />Topsoil removed and stored <br />Final grading (Phase I bond release <br />is ready for implementation) <br />Prior to mine disturbance <br />Prior to mining excavation <br />After coal is removed <br />Areas which are severely compacted After final grading is completed <br />will be ripped on the contour, and <br />topsoil replaced from stockpiles or <br />direct hauled <br />Area is drill seeded with the <br />appropriate perennial seed mix, <br />is seeded, shrubs or trees are <br />planted as spring or fall <br />dormant plantings (Phase II bond <br />release is ready for implementation). <br />A small grain cover crop is applied <br />at a rate of 20 (drilled) or 40 <br />(broadcast) lbs/acre <br />First appropriate planting season <br />after topsoil is replaced <br />Replaced topsoil and upper three <br />feet of final graded spoil will <br />be sampled, tested and evaluated. <br />Soil amendments will be added when <br />indicated by the results of soil <br />tests <br />After second or third growing <br />season <br />Rill and gully monitoring and repair, Years 1 through 8 after permanent <br />maintenance, and normal husbandry seeding <br />activities. Revegetation monitoring. <br /> <br />• <br />• <br />6 <br />