Laserfiche WebLink
• sediment control structures, and the dragline erection pad are illustrated on Exhibit 12-2 <br />and Exhibit 13-1, and are described in Tab 13. The areas of land that will be disturbed <br />through the five-year permit term are shown on Exhibit 20-1. The reclamation schedule is <br />shown on Exhibit 19-1. Reclamation costs are discussed under Tab 25, bonding. <br />• <br />• <br />Sb Revised OG/2G/91 <br />