Laserfiche WebLink
• <br />EXHIBITS <br />The following are the required exhibits for a Regular Permit application by <br />the Midway Sand & Gravel, Inc., P. O. Box 383, Fountain, CO 80817 <br />It i:; the intent of Midway Sand & Gravel, Inc, to incorporate Permit M80-086 <br />and Permit M80-156 into one permit M88-018. <br />F.XHTTITT A <br />The subject property is a 540 acre parcel <br />EXHIE3IT B <br />See attached. <br />EXHIBIT C <br />See attached. <br />EXHIBIT D - MINING PLAN <br />The mining operation to be conducted <br />extraction operation. The operation <br />piling top soil; removing the sand a <br />and re-vegetating in accordance with <br />See attached maps. <br />~~~~'~p~~r~' <br />~UPJ 71969 <br />M~~FD t_RiJtJlStO~i <br />CC~~;; pMAT10^~ ~ <br />will be a surfac~'-s~~d and gravel <br />will consist of stripping and stock- <br />id gravel; leveling the mined areas <br />the enclosed reclamation plan. <br />Equipment to be used on site will consist of the following: <br />1. Screening Plant: Power screen P1ark II, two 127 power screen 40' stackers. <br />2. Crusher: E.J. 45" Cone Crusher. <br />3. Front End Loaders: H-90 Hough, 745 Fiat Allas. <br />4. Dozer as needed. <br />5. Trucks: Tandem axle dump trucks, bobtails, and semi truck/trailer dumps. <br />6. Dodge Water truck for roads. <br />The proposed plan is to remove portions 4~ material that is in stock piles. <br />We will begin our mining operation in the north section of the quarry. We <br />will work in a southeast direction from the existing quarry. Top soil and <br />overburden will be stockpiled on the north and southeast edge of the area <br />being mined to facilitate reclamation. <br />It is estimated that approximately 60 acres in the north section will be <br />distrubed. This includes the area that has been previously mined. <br />Access to the proposed area will generally be provided by existing roads. <br />The access roads will be properly maintained by Plidway Sand & Gravel, Inc. <br />During the life of the operation, the haul distance from the mining site to <br />the scale is approximately 3/4 to 1,'-, miles. <br />To alleviate any dust problems on the access roads, truck speeds will be <br />kept under twenty miles per hour. All road surfaces are graveled. We will <br />use a water truck with a spray bar to control any dust problem. These <br />control measures have been discussed with Mr. John James from the Air <br />Pollution Control Division, and they have indicated their initial approval. <br />