Laserfiche WebLink
7205 California ~ Colorado Springs, Colorado 80917 <br />"An Equal Opportunity Employer" <br />March 9, 1988 <br />i <br />Exhibit A: See attached legal Desription. a <br />s <br />Exhibit R: See previously submitted Index Map. <br />Exhibit C: See attached map. <br />Exhibit D: Mining Plan <br />We will begin our operation oby removing portions of tf>~ stockpiles <br />located in the azes marked "STOQ(PIIm AREA". Same sto~:kpiles are <br />also located on the west side of .$he "GRAVE[. PTT AREA". 'i:us <br />material may also be removed. Aid extraction such as same small <br />amounts of pit run material removed would be done so within the <br />present pit. No disturbance should occur outside of the boundaries <br />shown on the map. <br />Exhibit E: Reclamation Plan <br />Following removal of the stocl~il <br />seeded and mulched in accordance <br />ations sutmitted under the origin <br />will be distributed prior to the; <br />activity during the last few yeai <br />so we do anticipate an effective: <br />d material the azeas shall be ripped, <br />ith the seeding mixture re~'~+•++a*+~- <br />1 permit. When available; wpsoil <br />eel' o operation. In azeas of no <br />the native vegetation is sprouting <br />eclamation. <br />We propose to use a loader to 1 the gravel, and possibly either a <br />motor grader with scarifier or er with ripper will be used to rip <br />the area. Once removal of the kpiles is complete, very little <br />effort wiJ.l be necessary to s and grade the azea. The area under <br />stocl~ile has not been disturbed then than grubbing the topsoil <br />prior to stockpiling ,and the stockpiles themselves. <br />11~e topsoil pile located in the southeast corner will be redistributed <br />using a dozer, followed by dress scarification with a motor grade, <br />topsoil p].acemert and proper s ~ and mulch application. <br />The small pit in the northeast corner will be daylighted to the north, <br />leaving a m;n;m,m of 4:1 sideslo~les using a dozer followed by scar- <br />ification, topsoil placmient and `the seeding process. <br />All seed mixtures and sideslope requirements under the original <br />~ contract shall be adhered to unless otherwise revised with the MLRD. <br />'~ <br />9 <br />i <br />7 <br />