Laserfiche WebLink
i <br />EXHIBIT G <br />MID-CONTINENT RESOURCES, INC. <br />P. O. BOX 158 <br />CARBONDALE, CO 81623 <br />LIMESTONE QUARRY RECLAMATION COSTS <br />1. Removal of Structures <br />2. Rough Grading <br />3. Smooth Grading <br />4. Fertilizer <br />5. Seed <br />6. Mulch <br />7. Seedlings <br />puarry Pit <br />Crusher/stockpile <br />Parking <br />New Road <br />Total <br />10.84 acre** <br />3.56 Acre <br />1.24 acre <br />0.66 acre <br />16.30 acres <br />$500/day* <br />400/acre <br />150/acre <br />100/acre <br />100/acre <br />100/acre <br />100/acre <br />5.46 acres <br />*MOSt structures are portable <br />**Quarry area is now 90B rock outcrop and thus only a small <br />portion will have "A" and/or "B" horizon material replaced. <br />No grading will be done. <br />1. Removal - one day @ $500. = 500. <br />2. Rough Grading @ $400. x 5.46 acres = 2184. <br />3. Smooth Grading @ $150. x 5.46 acres= 819. <br />4., 5., 6., 7. @ $400 x 5.46 acres = 2189. <br />Add 2 acres for quarry area = 800. <br />Total $6487. <br />