Laserfiche WebLink
t~+Yr~~4.-.. <br />_ i)d?~ <br />'~' ~ ~~' <br />~'~~'' <br />~ - <br />l~ <br />It is anticipated that MCC will need to occupy the drill pad azea 24-hours per day, 7 days per week, for <br />monitoring and water injection until after completion of Panel 13A (January 2001). Typically, mine <br />personnel will travel the roadway several times per day to bring samples, water level, temperature and <br />gas readings back to [he mine site. The drill pad area is [he surface area above the former combustion <br />zone of the underground S" Northwest Headgate azea. Atypical equipment list is attached which lists <br />equipment required at the drill sites for monitoring and water injection. <br />Final reclamation of the drill sites and associated pads and roads is anticipated to begin eazly in the <br />spring of 2001. Final reclamation would include pump and pipeline removal, sealing of drill holes, re- <br />grading of sub-soil (to approximate original contour) of pads and roads, re-distribution of topsoil, <br />seeding, fertilizing, and mulching. Sediment control measures would also be installed, i.e., silt fence, <br />erosion control netting and etc. The land use of grazing and wildlife habitat will remain the same. <br />Please notify me if you have questions regarding this permit application. <br />Since Y, _~~~~LV"c~ <br />~~ <br />Henry A. be <br />• Environmental Engineer <br />Enclosures: Special Use Permit Application <br />Drillsite Sections 20 and 29, T13S, R90W, 6'" PM <br />Equipment List <br />Emergency Drill Hole Data Sheet (5-31-00) <br />BWIvi's and ~ NWHG Drill Sites (~-17-00) <br />Interim Reclamation of Drill Sites (5-19-00) <br />cc: G. DiClaudio <br />P. Schmidt <br />Liane Mattson -United States Forest Service <br />Availabilirv of Records File <br />MR 270 file <br />r1 <br />f, J <br />.! <br />