Laserfiche WebLink
:- <br /> <br />Post QIaCC 90: 2140 <br />A'ceker. Colorado 81641 <br />Telephone 303~878~a021 <br />1•larch 31, 198? <br />Northern <br />Coal <br />Company <br />~II ~I~~I~~I~~~~~~I~ <br />999 <br />.r .: - <br />~~~`;[ <br />"" :h.l <br />,,.~Irl I1 r.f: °, . <br />Mr . Dave Shelton l; c'0 _ G~ !....;~r'~ , ; _ . ~,. <br />Mined Land Reclamation <br />Colorado Department of Natural Resources <br />423 Centennial L'uilding <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />RE: Reduction in Scope of Easeline Hydrology Ptonitoring <br />at Meeker Area ~?ines <br />Dear Mr. ShelCOn: <br />The t•feeker~Area Mines hydrology monitoring program was <br />initiated in play of 1979 and was designed to provide <br />data which could 6e used to establish an adequate base- <br />line from which we could predict, observe and mitigate any <br />impacts on surface and/or ground water regimes during <br />mining. During the time since our hydrology monitoring <br />program was implemented, three significant events have <br />occurred: 1) at least a year's baseline data have been <br />compiled on all surface water and ground water monitoring <br />sites, 2) a decision caas made to postpone indefinitzly <br />the development of the P and S '4ines, and 3) mining at <br />Northern No. 1 has been temporarily ceased. <br />To date the program has consisted of six basic types <br />of monitoring: surface water, ground water, mine wafer, <br />sedimentation ponds, stock ponds and spring seep water. <br />We have continued this monitoring program i.n order to <br />obtain at least one year of data. In December of 1981 <br />we completed one year's data collection for each of <br />our si:: baseline monitoring systems. The purpose of <br />this letter is to notify you that coe intend to reduce <br />our baseline data collection. Of course we will main- <br />tain our required system of. alluvial monitoring and <br />monitoring for the Curtis Crcek area. We have designed, <br />with the help of our consultants, n system which will enable <br />us to continue monitoring in the areas which could be affected <br />by oar operation in the Rienau !'ine (G Seam) and tha <br />