Laserfiche WebLink
PART II <br />Page No. 24 <br />Permit No.: CO-0036251 <br />NOTIFICATION REQUIREMENTS (CONTINUED) <br />12. Submission of Incorrect or Incomplete Information <br />Where the permittee failed to submit any relevant facts in a permit application, or submitted incorrect information in a permit <br />application or report to the Division, the pemrittee shall promptly submit the relevant information which was not submitted or <br />any additional information needed to correct any erroneous information previously submitted. <br />13. Bypass <br />a. Bypasses are prohibited and the Division may take enforcement action against the pemilttee for bypass, unless: <br />i) The bypass is unavoidable to prevent loss of life, personal injury, or severe property damage; <br />ii) There were no feasible alternatives to bypass such as the use of auxiliary treatment facilities, retention of untreated <br />wastes, or maintenance during nomtal periods of equipment downtime. This condition is not satisfied if adequate <br />back-up equipment should have been installed in the exercise of reasonable engineering judgment to prevent a <br />bypass which occurred during normal periods of equipment downtime or preventive maintenance; and <br />iii) Proper notices were submitted in compliance with Part II.A.4. <br />b. "Severe property damage" as used in this Subsection means substantial physical damage to the treatment facilities which <br />causes them to become inoperable, or substantial and permanent loss of natural resources which can reasonably be <br />expected to occur in the absence of a bypass. Severe property damage does not mean economic loss caused by delays in <br />production. <br />c. The permittee tray allow a bypass to occur which does not cause effluent limitations to be exceeded, but only if it also is <br />for essential maintenance or to assure optimal operation. These bypasses are not subject to the provisions of paragraph <br />(a) above. <br />d. The Division may approve an anticipated bypass, after considering adverse effects, if the Division determines that the <br />bypass wiil meet the conditions specified in paragraph (a) above. <br />14. Reduction, Loss, or Failure of Treatment Facility <br />The pernrittee has the duty to halt or reduce any activity if necessary to maintain compliance with the effluent limitations of <br />the permit, Upon reduction, loss, or failure of the treatment facility, the permittee shall, to the extent necessary to maintain <br />compliance with its permit, control production, control sources of wastewater, or all discharges, until the facility is restored or <br />an alternative method of treatment is provided. This provision also applies to power failures, unless an alternative power <br />source sufficient to operate the wastewater control facilities is provided. <br />It shall not be a defense for a permittee in an enforcement action that it would be necessary to halt or reduce the permitted <br />activity in order to maintain compliance with the conditions of this permit. <br />B. RESPONSIBILITIES <br />1. Inspections and Right to Entry <br />The permittee shall allow the Division and/or the authorized representative, upon the presentation of credentials: <br />a. To enter upon the permittee's premises where a regulated facility or activity is located or in which any records are <br />required to be kept under the terms and conditions of this permit; <br />b. At reasonable times to have access Yo and copy any records required to be kept under the temas and conditions of this <br />permit and to inspect any monitoring equipment or monitoring method required in the permit; and <br />