My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO21737
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO21737
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:43:02 PM
Creation date
11/20/2007 2:29:58 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977306
IBM Index Class Name
Hydrology
Doc Date
6/23/2005
Doc Name
water sampling reports
From
cotter
To
dmg
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PART II <br />Page No. 23 <br />PemutNo.: CO-0036251 <br />,. NOTIFICATION REQUII2EMENTS <br />7. Upsets (Continued) <br />b. Conditions Necessary for a Demonstration of Unset <br />A pemuttee who wishes to establish the affirmative defense of upset shall demonstrate through properly signed <br />contemporaneous operating logs, or other relevant evidence that: <br />i) An upset occurred and that the petmittee can identify the specific cause(s) of the upset; and <br />ii) The pemtitted facility was at the time being properly operated and maintained; and <br />iii) The peanittee submitted proper notice of the upset as required in Part II.A.4. of this permit (24-hour notice); and <br />iv) The permittee complied with any remedial measure necessary to minimize or prevent any discharge or sludge use or <br />disposal in violation of this permit which has a reason able likelihood of adversely affecting human health or the <br />environment. <br />In addition to [he demonstration required above, a petmittee who wishes to establish the affirmative defense of upset for a <br />violation of effluent limitations based upon water quality standards shall also demonstrate through monitoring, modeling <br />or other methods that the relevant standards were achieved in the receiving water. <br />c. Burden of Proof <br />1n any enforcement proceeding the permittee seeking to establish the occurrence of an upset has the burden of proof. <br />8. Discharge Point <br />Any discharge to the waters of the State from a point source other than specifically authorized by this permit is prohibited. <br />9. Proper Operation and t.Iaintenance <br />The pemuttee shall at all times properly operate and maintain all facilities and systems of treatment and control (and related <br />apprutenances) which aze installed or used by the permittee as necessary to achieve compliance with the conditions of this <br />permit. Proper operation and maintenance includes effective performance and adequate laboratory and process controls, <br />including appropriate quality assurance procedures. This provision requires the operation of back-up or auxiliary facilities or <br />similar systems which are installed by the pemrittee only when necessary to achieve compliance with the conditions of the <br />permit. <br />10. Minimization of Adverse Impact <br />The pemuttee shall take all reasonable steps to minimize or prevent any discharge of sludge use or disposal in violation of this <br />permit which has a reasonable likelihood of adversely affecting human health or the environment. As necessary, accelerated <br />or additional monitoring to determine the nature and impact of the noncomplying discharge is required. <br />11. Removed Substances <br />Solids, sludges, or other pollutants removed in the course of treatment or control of wastewaters shall be disposed in <br />accordance with applicable state and federal regulations. <br />For all domestic wastewater treatment works at industrial facilities, the pernrittee shall dispose of sludge in accordance with <br />all State and Federal regulations. <br />
The URL can be used to link to this page
Your browser does not support the video tag.