EXHIBIT D <br />RECLAMATION PLAN <br />PROPOSED SCHOOL FIELD PIT <br />The reclamation will begin with the completion of the <br />first phase of mining. It is estimated the first phase <br />will be under active mining for approximately 5 years. <br />Grading will be done as the mining proceeds to the <br />west and final grading will take place at the end of the <br />first phase. <br />The slopes will be left at 4:1 and top soil will be <br />replaced to a depth of 6" - 12" <br />Due to thewater table depth and distance to surface <br />water (approx. '~ mile), there will be minimal if any effect <br />on water quality in the area. Colorado water laws will be <br />complied with. <br />Top-soil will be stored in a berm away from the mining <br />operation. If left for more than a year, the stock-pile will <br />be revegetated (see Exhibit C). <br />Revegetation in conjunction with reclamation of the site <br />will be accomplished according to the ASC recommendations <br />(see Exhibit D). <br />There will be no buildings or structures placed for this <br />operation. <br />