My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO21676
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO21676
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:43:00 PM
Creation date
11/20/2007 2:26:27 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977424
IBM Index Class Name
Hydrology
Doc Date
9/2/1996
Doc Name
LOGAN WASH SURFACE WATER MONITORING AND DATA ANALYSIS PLAN
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
107
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />Roan Creek is sampled quarterly regardless of flow in the unnamed tributary, and at a monthly <br />frequency when station UN-1 is flowing. <br />2.4 DATA COLLECTION PROCEDURES <br />This plan for surface water monitoring includes water-quality sampling and measurement of <br />stream dischazge. Standard methods for the collection of surface water samples aze provided <br />in the National Handbook of Recommended Methods for Water Data Acquisition (I1SGS, <br />1977). Accepted methods for measurement of stream dischazge aze provided in Dischazge <br />Measurements at Gaging Stations (USGS, 1973). These two references provide the basis for <br />data collection methodology in to this plan. <br />Specific data collection methodology aze summarized in Appendices A and B. Appendix A <br />includes Sample Handling and Documentation procedures to be followed. Appendix B <br />includes alternative methods for measuring stream dischazge. The following subsections <br />briefly describe the data wllection procedures to be followed for this plan. <br />2.4.1 Sampling Sequence <br />Samples will be collected in downstream sequence. Pipeline station P-1 will be sampled first, <br />followed by collection of sample Pond-1. Samples from Roan Creek station RC-1 will be <br />collected followed by station RC-2. <br />2.4.2 Sampling and Measurement Location <br />Water samples and dischazge measurements will be collected at the same general location at <br />the same time. Water samples should be collected first, followed by measurement of <br />discharge. Water samples are collected first to reduce the potential for sample disturbance. <br />Agitation of the pipe or channel sediments prior to sample collection will be avoided. Samples <br />wilt be collected by carefully submerging the appropriate analytical quality sample bottle in the <br />water flowing from the stream/opening without disturbing or entraining sediment. If <br />necessary, a separate analytical quality container may be used to collect the water and transfer <br />it into the appropriate sample bottle. Caze will be taken to assure that the most representative <br />sample possible is collected. <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.