Laserfiche WebLink
<br />the fall and winter months. Therefore, weekly, monthly, and quarterly sampling frequencies <br />aze necessary depending on the season. Weekly monitoring is required for certain stations <br />during the snowmelt-runoff months of March through June to provide data for rapidly <br />changing conditions. Monthly or quarterly monitoring is necessary during interim months to <br />characterize seasonal changes in flow and water quality. Data collection frequencies for all <br />monitoring locations are presented in Table 1. <br />Table 1 <br />Data Collection FY~equency <br /> <br />gtatioa TD :. ,....... <br />..::.:..:::.:'::. F.:::...uenc ': <br />P-1 Monthly (July-February} <br />Weekl arch-June <br />POND-1 Monthl <br />UN-1 Monthly (July-February) <br />Weekl arch-June <br />RC-1 Monthl / uarterl <br />RC-2 Monthl / uarter] <br />NOTE: Weekly sampling will take place for at least one full snowmelt season. If the <br />streams are not running on a consistent basis, monitoring frequency will then be <br />reduced to monthly. <br />LWM is visited by site personnel once a week to conduct sampling and inspections pursuant to <br />the current CDPS permit. This requirement includes sampling and/or inspecting Outfalls 001 <br />and 002, the pipeline, and the surface impoundment. With the exception of more frequent <br />weekly sampling during the snowmelt period, additional visits to LWM aze not scheduled. <br />Three new monitoring locations have been identified in this plan as shown in Figures 2 and 3, <br />Logan Wash Surface Water Monitoring Locations. These include UN-1, RC-1, and RC-2. It <br />is anticipated that the unnamed tributary (iJN-1) will only contain flowing water during <br />snowmelt- or rainfall-runoff periods. This station will be checked for flow and sampled at the <br />frequency listed in Tale 1, but no samples will be collected if there is no flow. If station UN-1 <br />is not flowing during a weekly or monthly sampling visit, Roan Creek sampling will be <br />postponed until the next month when UN-1 is flowing, or until the quarterly sampling round. <br />12 <br />