Laserfiche WebLink
<br />3.7 FINAL GRADING AND EROSION PROTEC'PION <br />n <br />`~ Crown grade for the finished road shall be 2%. Maximum sustained <br />- grade shall be 8%. Grades shall not exceed 4%u for 300 feet approach- ~ - <br />ing intersections. <br />Rip-rap (large rocks) shall be placed at the culvert outlets u erosion <br />protection. <br />c <br />8.0 CONSTAUCTION 085EAFATION <br />We recommend that the conshuctioa of the embanlonent be observed <br />by a qualified Soils Engineer from our office and that we are notified at <br />least 48 hours prior to conshuction. Conshuction observa6oa is neces- <br />sary is order to document conditions during constructioq to wnfiva <br />the assumption used in recommending these specifications, and to <br />modify the specifications if ~cessary. <br />( <br />• <br />t <br />~' <br />Attachment 2.05.3(3)9- 7 <br />6 <br />u <br />REVISED MARHC 2006 Attachment 2.05.3(3)-9-8 <br />