Laserfiche WebLink
h. Testing for Non-stormwater - As previously outlined, areas subject to this SWMP have been <br />evaluated for the presence of non-stormwater discharges by qualified individuals based upon <br />the interpretation of the regulations, and have been found to be absent. <br />6. Comprehensive Inspection -Areas addressed within this SWMP are visually examined by a <br />competent person for condition and maintenance on at least asemi-annual basis, often in <br />conjunction with inspections conducted by CDMG personnel. The tehnica] services group keeps <br />records of these inspections on file at the mine office. Maintenance is done on an "as-needed" <br />basis and recorded by maintenance department personnel. <br />Annua] Report -Annual reports shall be submitted on or before February 15'" of each year, and <br />will be signed and certified in accordance with the requirements set forth in the permit. <br />Plan Updates -This plan shall be amended as required by the pemvt within 30 days of any change <br />in operation, which adversely affects the implementation of this plan. <br />I:~entenviron~doc~swmpW0000\Stormwater mg[ plan Aug03 <br />