My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO21632
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO21632
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:42:59 PM
Creation date
11/20/2007 2:25:17 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1993030
IBM Index Class Name
Hydrology
Doc Date
5/10/1993
Doc Name
FINAL PERMIT COLO DISCHARGE PERMIT SYSTEM STORM WATER CERTIFICATION COG-500808 CRYSTALJACK TELLER CO
From
JOHN O BUCKNER
To
CDOH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COLORADO DEPAR77HENT OF HEALTH, Water Qualiry Control Division <br />Rationale • Page 3. Permit No. COGS00000 <br />7//. COVERAGE UNDER THIS PERMIT <br />disnicts or any entity created by or pursuant ro State law. (Note: the Transportation Act use a different <br />classification scheme jot municipaUtiv than is outUned in EPA's municipal stormwater permit rcquirtmems. Under <br />the 'Transportation Act, the determination of the sue of a municipaliry include the total population of the <br />municipa/iry. For erampk, a rounty with a tola7 population of os+er ]00,000 is not eligible jot the Transportation <br />Act exemption, teen though the saint rounry may not be required to obtain a municipal permit.) <br />Stormwater discharge associated with industrial activity (except for airports, .sham electric power plams, or <br />uncontrolled sanitary landfills), that art owned or apemted by a minor municipality are not required to apply jot <br />or obtain a stormwarer pmnit at this tune. (Note This aemption does not apply to other, privately owned <br />indtstrie within the saris minor municipality.) <br />These facilitie are nor pmnanently erempred from the regu4uion, bur art instead glared in Phase 77 of the <br />stormwater program. Phase !I facilitiv, including minor murticipalitiv, are curremty under a moratorium, which <br />annpts them from pmnit requiremems under the stormwater program. /t is expected that roverage will be <br />required at some future date. <br />IV AI'PLICA77ON AND CERTU=ICATTON <br />A. AdcUtional AppUeaRon Reatdremtnts <br />nth the inclusion of srormwartr provisions in this permit, the application requirements hoer changed to some event <br />as well. /n addition to tlu application rcquiremems outlined in the previous permit, the following must afro be <br />submined: <br />I. Dvcriprion of stormwoter discharge, including drainage area. <br />2. Desmptian of proem and proposal but managemem practice at site, including map. <br />3. Any esistrng watts quality data on stormwattr discharge. <br />4. For new jacilitiv (beginning operations after October 1, 1992), and for all other jacilitiv applying afrer <br />July I, 1993, certification as to the preparation oja SWMP. (See Section V.B.3.a of the Rationale for SWMP <br />cert~cation requirements for aisting faciGtie applying on time.) <br />14. Pctmit Ccrtifirations <br />This permit is malt up of stsrro! parts, some of which do not apply to al! perminee (i. e., while mast jacilitiv will <br />require rosrrage under the stormwarcr section L C, many will not require rovtrage under the proress watts section <br />I.B). Therefore, the individud centcation prepared for tack appUcant wiU iMicate whether or mt Part LB of the <br />permit must be fopowcd by that applicam. In all case (except as noted in Section 71/. C, above), Part I. C must be <br />fol owed. (!n the absence of suds indication from the Division, the perminee will be reponsibk jar determining <br />arut then romplying with the applicable sections in Part L) /n odditian, all permitttes will bt required to comply <br />with Pair I, subparts A, D, E aid F, and aU of Part II of the ptrmil. <br />V. TERMS AND COND177ONS OF PERMIC <br />A. Process Water Dtseharees <br />Numeric Limitations: Numeric limits will be applied for some of the industrial cnregoriv aos+ered by this <br />permit. Thee limits are from the EPA Federal Guidelines for the applicable point source category, as follows: <br />a. Mineral mining and processing poim source category - 40 CFR 436 -subpart $ (meshed stone), C <br />(construction sand and grave!), D (industrial sand), R (phosphate rack) -and all other industrial facilitiv <br />rosrred order SIC Cade 14, except those specifically !'sited in paragraphs b and c below, and concrete <br />
The URL can be used to link to this page
Your browser does not support the video tag.