Laserfiche WebLink
~_ ~ • <br />Cotter Corporation - C-JD-8 Mine <br />Stormwater Management Plan -Permit 1/ C( <br />October 7, 1993 -Page 3 <br />f. Best Management Practices <br />1. The crest of the waste dump is provided with a berm r <br />all run-on to the waste dump within the waste dump <br />2. The fueling area has a berm surrounding it which is <br />any fuel spills from this tank. - ~ - ~ ~-~-.--..a <br />3. By May 1994 three silt fences will be located just dowc <br />the toe of the waste dump as shown on Exhibit B. The <br />are intended to minimize sedimentation in stormwater <br />the sides of the waste dump. <br />4. By May 1994 a silt fence will be located where the r. <br />runoff from the access road collects prior to leaving the <br />as shown on Exhibit B. Construction of this fence is 1 <br />arrangements with the surface land owner. <br />contains <br />to contain <br />ream from <br />silt fences <br />noff from <br />ty of the <br />property <br />i>' access <br />g. Employee Training <br />Employee training aimed at maintaining employee awareness of th stormwater <br />management plan will be conducted twice per year. This training ' anticipated <br />to occur in the summer and winter of each year. <br />h. Testing for Non-Stormwater Discharges <br />Dry weather observations have indicated there are no non-stonnwate discharges. <br />5. Comprehensive Inspection <br />The SWMP administrator identified in item 4a will be responsible for ~e required <br />inspections. <br />