Laserfiche WebLink
• AREA 15 <br />SOUTH DRAW DAM MATERIAL <br />TOCKPILE AREA <br />Area 15 is divided into 2 subareas: <br />15a - Topsoil Haul Roads <br />15b - Stockpile Areas <br />1982 Activity <br />Subarea 15a - Permanent reclamation by replacement of topsoil and re- <br />vegetation of 3 acres of mild slopes using Technique 4. <br />1983 Activity <br />Subarea 15a - Permanent reclamation by revegetation of 6 acres of steep <br />slopes using Technique 1, 1 acre of mild slopes using Technique 4, and fer- <br />tilizing 3 acres using 200 lbs/acre of 33-0-0 fertilizer. This work includes <br />• reseeding up to 33% of 1982 revegetation work, depending upon the success of <br />previous plantings. <br />Subarea 15b - Permanent reclamation of 10 acres of mild slopes by re- <br />placement of topsoil and revegetation using Technique 4, 6 acres of steep <br />s]opes using Technique 1, and 12 acres of semi-steep slopes by Technique 3. <br />1984 Activity <br />Subarea 15a - Permanent reclamation by revegetation of 2 acres of steep <br />slopes using Technique 1, 1 acre of mild slopes by Technique 4, and fertilizing <br />9 acres using 200 lbs/acre of 33-0-0 fertilizer. This includes reseeding up to <br />15% of 1982 revegetation work, depending upon the success of previous plantings. <br />Subarea 15b -Permanent reclamation by revegetation of 2 acres of steep <br />. slopes using Technique 1, 4 acres of semi-steep slopes by Technique 3, 2 acres <br />of mild slopes using Technique 3, 2 acres of mild slopes by Technique 4 <br />PD 1000.102 A26&30 <br />