Laserfiche WebLink
• AREA 14 <br />SOUTH DRAW 70PSOIL STOCKPILE <br />1982 Activity <br />Interim stabilization by revegetation of 3 acres of mild slopes using Technique 2 <br />and fertilizing 5 acres of mild slopes using 200 lbs/acre of 33-0-0 fertilizer. <br />1983 Activity <br />Interim stabilization by revegetation of 2 acres of mild slopes using Technique 3 <br />and fertilizing 8 acres using 200 lbs/acre of 33-0-0 fertilizer. This includes <br />reseeding up to 50% of 1982 revegetation work, depending upon the success of <br />previous plantings. <br />1984 Activi <br /> Interim stabilization by revegetation of 1 acre of mild slopes using Technique <br /> 3 and fertilizing 8 acres using 200 lbs/acre of 33-0-0 fertilizer. This includes <br />reseeding up to 10% of 1982 revegetation work, depending upon the success of <br />previous plantings. <br />• <br />PD 1000.102 A25 <br />