Laserfiche WebLink
~• D. Data Processing and Reportino <br />1. Copies of the field and laboratory data sheets will be sent quarterly to <br />the CMLRD. <br />2. Data will be summarized in the annual hydrology report to CMLRD. <br />IV. In-Mine Monitoring <br />A. Monitoring_Locations -points of water inflow within active mine workings. <br />B. Monitoring Frequency <br />1. Asemi-annual survey of water inflow to the mine will be <br />conducted during the spring and fall of each year. <br />2. Estimate of the quantity of each source will be made. <br />3. Field water quality parameters (pH, electrical conductivity and <br />temperature) will be measured for all significant inflows. <br />4. Locations of all inflows will be recorded on a mine workings map. <br />C. Data Processing and Reporting <br />A table keyed to the mine map will be prepared which depicts quantity, <br />duration, and quality of inflows. Attempts will be made to correlate inflow with <br />geologic structure. <br />The annual hydrology report will document mine inflows, water discharged from <br />the mine, water consumed in the mine, water imported for use in the mine, and <br />a discussion of balance within the mine. The annual report will be based on <br />an October 1 through September 30 water year, and will be submitted to the <br />Division by February 1 of each year. <br />Revised 9/12/97 <br />Minor Revision No. 34 <br />