My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE50064
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE50064
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:54:48 PM
Creation date
11/20/2007 2:18:54 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981014A
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
EXHIBIT 25 HYDROLOGIC MONITORING PLAN
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />Pond No. 5 on tributary to Newlin Creek <br />NPDES Discharge Point 001 (Loadout) at outlet from Sedimentation <br />Pond L-1 on Chandler Creek <br />NPDES Discharge Point 002 (Loadout) at outlet from Sedimentation <br />Pond L-2 on Oak Creek <br />B. Sampling Freouencv and Procedure <br />1. Selected water quality parameters and flow will be measured <br />weekly during periods of active discharge <br />2. Water quality samples will be collected monthly if <br />discharge is occurring <br /> C. Samo lina Procedure <br /> 1. The following information will be provided on each sample <br /> bottle label: <br /> - Station/Well designation <br />• - Date and time <br /> - Bottle number <br /> - Analysis code <br /> - Individuals initials <br /> 2. Samples will be collected in such a manner as to minimize <br /> physical disturbance at the sample point. <br /> 3. Sampling devices will be cleaned prior to use and samples <br /> will be placed in clean sample containers which will be <br /> sealed at the sampling site. <br /> 4. Samples will be placed in a cooler with ice immediately <br /> after collection and will be shipped within 24 hours to a <br /> laboratory for analysis. <br /> 5. Weekly water quality sampling will included measurement of <br /> pit and collection and analysis of grab samples for <br /> settleable solids. If there is a visible sheen either on <br /> the pond surface or downstream from the discharge point <br /> grab samples will also be analyzed for oil and grease. <br />• 6. Monthly water quality samples will be analyzed for TSS and <br /> total iron. <br />
The URL can be used to link to this page
Your browser does not support the video tag.