Laserfiche WebLink
<br />MINING PL.'~N -Exhibit "D" (Continued) <br />STAGE #11 <br />1. Access roads and crusher are progressively moved along closely behind the <br />mining operation as required. <br />2. Stage Eleven consists of 10 acres which will be mined in increments of 2 acres <br />per year, thus lasting for '5 years. <br />3. Operations will start on the South boundary of Stage 11 and will proceed to the <br />North and East boundary of Stage 11, as shown on map (Page "C-1"). <br />4. Sand sad Gravel will be extracted in the same manner as indicated in Stage One, <br />(Pages D-2 and D-3, Paragraph 4) except that topsoil and overburden stockpiles <br />will be located in the Northeastern 1/4 of Stage Eleven. <br />5. No water impoundments are located at the site, and the water will be drained <br />naturally to the South. The topography of the affected area will be to a gentle <br />three to one (3:1) slope or less so that very little erosion will occur. <br />6. Mining Plan stages will be marked with red markers along the mining stage <br />boundary so that the contractor will have no difficulty in staying inside the <br />mining stage boundary. <br />7. Refer to Mining Stage Timetable ~Page'D-]b" of Mining Plan) for overall picture. <br />8. Access roads are included in the affected area. <br />"D-13" <br />