Laserfiche WebLink
MINING PLAN -Exhibit "D" (Continued) <br />STAGE #2 <br />1. First the fines stockpile found at the site will be removed and sold to the County <br />of Kiowa and used as fill for the old, mined out area found in the existing pit <br />in the fall of 1985. <br />2. Stage Two consists of 10 acres which will be mined in increments of 2 acres <br />per year, thus lasting for 5 years. <br />3. Operations will start on the North boundary and proceed to the South boundary <br />of Stage Twq as shown on Map (Page"C-1"). <br />4. Sand and gravel will be extracted in the same manner as indicated in Stage One, <br />(Pages D-2 agd D-3, Paragraph 4). Stockpiles will be located in Southeast 1/4. <br />5. No water impoundments are located at the site, and the water will be drained <br />naturally to the Southwest. The topography of the affected area when reclaimed <br />will be to gentle three to one (3:1) slopes or less so that very little erosion will <br />occur. <br />6. Mining Plan stages will be marked with red markers along the mining stage <br />boundaries so that the Contractor will have no problem staying within the <br />mining stage boundary. <br />7. Refer to D'&ning Stage Timetable (Page "~16" of Mining Plan) for overall <br />picture. <br />8. All access roads are included in the affected area. <br />"D-4" <br />