Laserfiche WebLink
sheet 1 of 2 <br />CIRCES Cost Estlmatlna Software <br />TRUCK/LOADER TEAM WORK <br />Task # <br />Date <br />User: <br />Agency or organization name :ORMS <br />003 State : Cobredo <br />01!22/2007 County :Ganreld <br />RMW Site :Grand River Park Project <br />Permit or other job ac8on :Initial Bond Calculation <br />Task descrlptlon : Backflll Regulating Pond <br />HOURLY EQUIPMENT COST ~ ~~ ~~~ Shift basis: ~~~ 1 per day ~~ <br />-Loader :Cat 3458 L Series ll <br />ed area • NA <br />Road maintenance -Motor grader <br />-Water Wck <br />D8R Sedes l/-8SU <br />Cost Breakdown : ruck/Loader Work Team <br />Truck Loading Tool Support Equipment <br />Load Ama Dump Area Road Maintenance Equipment <br />Motor Grader Water Tmck <br />Import data filename : truck2 excavate NA dozer NA NA <br />% Ufilizallon-machine : 100 87 NA 100 NA NA <br />-Ripper attachment: NA NA NA 0 NA NA <br />Ownership cosUhour: $33.14 $63.20 NA $51.18 NA NA <br />Operating cosUhour: $43.55 $66.76 NA $73.75 NA NA <br />Ripper op. cosUhour : NA NA NA $0.00 NA NA <br />Operator cosUhour: $21.75 $32.96 NA $32.78 NA NA <br />Unit subtotals : $98.44 $182.92 NA $15770 NA NA <br />Number of units : 3 1 0 1 0 0 <br />Group subtotals: Work: $458.25 Support: $15770 Maintenance: $0.00 <br />Total work team cosf/hour: 5615.95 <br />MATERIAL QUANTITIES <br />IniBal <br />volume : 4,444 LCY <br />Swell Loose <br />factor: NA volume <br />Source of quanfity take-o(f : 200' x 200' x 3' dee <br />Source of es8mated swell factor:NA <br />Matedal purchase cost : $0.00 /LCY <br />Truck Capacity <br />Truck PaNOad fweichtl Basis <br />Pertni0job # : M-2006-046 <br />Abbreviafion :none <br />Filename : M048-003 <br />Total cost <br />Truck Bed (volume) Basis <br />4,444 LCY <br />$o <br />Matedal weight : 3,400 pounds/LCY Struck volume : 13.60 LCY <br />Descr.: Sand and gravel -Wet Heaped volume : 1780 LCY <br />Rated payload : 50,000 pounds Average volume : 15.70 LCY <br />Payload capacity : 14.71 LCY Adjusted volume': 14.71 LCY <br /> Final truck volume based on number of loader passes : 14.00 LCY <br /> • Uuck valurte atllustee to rid excess rend peNoae or neapee vdume <br />Loadlno Tool Capacity : ob Condition Corrections : Site altitude (tt.) : 5,400 <br />Rated cepadty (nom. heaped) : 4.000 LCY Truck Loader Source <br />Descr.: Loose material - 1- end over (85 - 90%) Altltude adj.: 1.000 1.000 (Cat HE <br />Bucket fill factor : 0.875 Job effiGency : 0.830 0.830 (1 shiNda <br />Adjusted bucket capacity : 3.500 LCY Net wmectlon : 0.830 0.830 <br />