My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE50006
DRMS
>
Back File Migration
>
Permit File
>
600000
>
PERMFILE50006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:54:46 PM
Creation date
11/20/2007 2:16:01 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2006046
IBM Index Class Name
Permit File
Doc Date
1/25/2007
Doc Name
Permit Approval- FW and PW Request
From
DRMS
To
Silt Sand & Gravel, LLC
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Truck/Loader Team Work cont'd Task # : 003 <br />Loadino Tool cycle Time : Number of loading tool passes required to fill Wck <br />Excavators and front shovels -machine cyde tlme vs. Job conditlon ra8ng :EXCELLENT <br />- selected value within basic rs8ng : AVERAGE <br />Track loaders -material descr.:NA <br />-cyde time elemenLa (min.) : Load <br />NA Maneuver: NA Dump: 0.100 <br />Wheel and back loaders -unadjusted basic loader cyde tlme (load, maneuver, and dum{ NA minutes <br />Cyde Time Factors Loading CondiBon Description Factor (min.) Source <br />Material: A NA NA <br />Stockpile : A NA NA <br />Truck ownership : A NA NA <br />Operation : A NA NA <br />Dump target: A NA NA <br /> Net cyde time adjustment : NA minutes <br /> Adjusted loader cyde time (total time per loader pass) : 0.223 minutes <br /> Net load 8me per Wck' : 0.769 minutes <br />Truck cycle Time : • bulk or+sc ioaae. cyae wapetea eun~v tnrck e<Menpe n eel. imeer cyae ame <o,d,a,ga uma <br />Truck exchange time ": 0.50 minutes........ Adjusted for site altitude : 0.500 minutes <br />Truck load tlme: 0.769 minutes........ Adjusted for s(te altitude : 0.769 minutes <br />Truck maneuver and dump 8me: 0.90 minutes........ Adjusted for site al8tude : 0.900 minutes <br />"ser at o I/ extlanpa acre <atll. Roeder cyGe Ume (budr ewlierge canplelee Eurinp 1st loaeer cyde) <br />Truck travel (haul 8 return) 8me: Road condi8on :Soft, rutted dirt, no maintenance ar water, 4'tire penetration <br />Haul route <br />Road <br />sesoema Haul distance <br />(feet) Grade <br />res. (%) Rolling <br />res. (%) Total <br />resistance (%) Speed <br />(/eebminute) Travel tlme' <br />(minutes) <br />1 1,300 -1.00 8.00 700 1050 1.304 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />minutes <br />•kevatume sawntar eeM aepmentindWaaaderebar/tlecdereaan a0iuskrent Return tlme": 0.918 minutes <br />-taaiheuianaretumumearw.r~~nduaroammeaeeiuavrcnt TotalWdccyde8me: 4.391 minutes <br />Loading tod unit productlon : 661.94 LCY/hour...... Adjusted for job effidency : 549.41 LCYR1our <br />Truck unit produc8on : 191.31 LCY/hour...... Adjusted forjob effidency : 158.78 LCYR1our <br />Optlmal no. Wdrs/IOading tool : 3 Wcks........... Seleded no. WcksAoader: 3 Wcks <br /> Adjusted hourly buck team productlon : 476.35 LCY/hr <br /> Adjusted hourly single Wck/loader team productlon : 476.35 LCYRv <br /> Adjusted hourly mul8ple Wck/loader team productlon : 478.35 LCY/hr <br />JOB TIME AND COBT ~~~ ~~~ ~ ~ ~ ~ ~~~~ <br />Fleet size : 1 Team(s) Total job 8me : 9.32 Hours <br />Unit cost : 51.293 ILCY Total job cost : 55, 748 <br />4 <br />sheet 2 of 2 <br />Return route : Haul 8me " : 1.304 <br />
The URL can be used to link to this page
Your browser does not support the video tag.