Laserfiche WebLink
. • • <br />SHIPPS PIT - WELD COUNTY <br />EXHIBIT B: MINING PLAN "CONTINUED" <br />3 months. However, if the Department of Highways maintenance forces <br />are doing the work it is possible that they could have a stockpile <br />of produced material in the pit area for 2 or 3 years. The object <br />of this being to have readily available material for use in routine <br />highway maintenance, repairs, and overlays when such work is <br />required in the area. Quite often in our maintenance operations the <br />mining of gravel for stockpile production will only take 2 or 3 <br />weeks, or less, every year or two. Work in the pit area then would <br />be limited to occasional days throughout the year when material is <br />hauled from the stockpile to the roadway or perhaps for one or two <br />months some years when when the asphalt plant would be moved into <br />the permit area to produce mix for patching or overlays. <br />f) The following types of equipment could possibly be utilized in the <br />permit area: dozers, front end loaders, trucks, motor graders, earth <br />moving scrapers, farm type tractors, seed drills, mulchers, ~ <br />fertilizer spreaders. <br />