Laserfiche WebLink
l <br />Current Pond Capacity Requirement Calculations <br />Pond A <br />Contributing Area: <br />Disturbed Area east of Hwy 13 0.50 acres CN 88 <br />Disturbed Area west of Hwy 13 3.45 acres CN 88 <br />Total = 3.95 acres <br />25 year - 24 hour precipitation = 2.26 inches <br />Runoff from above storm at CN 88 = 1.17 inches <br />Pond Volume required to store 25 yr - 24 hr storm = <br />3.95 acres x 1.17 in x 1 ft = .385 ac.ft. <br />12in <br />Sediment volume = 3.95 acres x .1 ac-ft = .395 ac.ft. <br />acre <br />Total pond volume required = 0.78 ac-ft <br />On site measurements on July 25, 1984 showed a pond volume <br />in excess of 1.0 acre-feet, so that with the diversion <br />ditches installed, Pond A is capable of holding the zunoff <br />from the 25 year - 24 hour storm in addition to a <br />conservative 3 year sediment volume. <br />Pond B <br />Contributing Area: <br />Disturbed Area east of Hwy 13 1.85 acres CN 88 <br />Disturbed Area west 4.05 acres CN 88 <br />Total = 5.90 acres CN 88 <br />Pond Volume required to store 25 yr - 24 hr storm = <br />5.90 acres x 1.17 in x 1 ft = .575 ac-ft <br />12in <br />Sediment volume = 5.90 acres x .1 ac-ft = .590 ac-ft <br />acre <br />Total pond volume required = 1.17 ac-ft <br />On site measurements showed an existing pond volume in <br />excess of 3.1 acre-feet, so that the pond is more than <br />capable of storing the inflow from the 25 yr - 24 hr. storm <br />plus the 3 year sediment volume. <br />