My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
HYDRO21342
DRMS
>
Back File Migration
>
Hydrology
>
HYDRO21342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 8:42:52 PM
Creation date
11/20/2007 2:13:02 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1991078
IBM Index Class Name
Hydrology
Doc Date
3/12/1993
Doc Name
HONEYWOOD COAL CO HAMILTON MINE STORM WATER MANAGEMENT PLAN C-91-078
Permit Index Doc Type
NPDES
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 Honeywood Coal Company <br />Stormwater Management Plan <br />' Page 4 <br />g. Employee Education: There are no requirements for <br />' spill response or material management practices. <br />The performance of preventive maintenance is the <br />function that employees will perform to implement <br />and maintain this SWMP. This work will be directed <br />' by the Mine Manager so no employee education is <br />considered necessary. <br />h. Testing for Non-Stormwater: The potential <br />stormwater discharge points have been evaluated for <br />the presence of non-stormwater discharges such as <br />t mine drainage, contaminated springs, sanitary <br />waste, or process water of any kind. The <br />evaluation was performed by the undersigned. The <br />evaluation was based on a visual observation of all <br />' of the stormwater discharge points shown on the <br />enclosed mine map. The inspection occurred on <br />March 5, 1993. <br />' Di~1~ ~ 03-c'9-93 <br />. Ki t JS es Date <br />' 6. Comprehensive Inspection <br />One of the individuals identified in Sa above will inspect the <br />' stormwater management controls at least twice each year in the <br />spring and fall. The inspection will note if the haul road <br />ditches, ditch turnouts or sediment structures require <br />' maintenance. The inspection will also note the condition of <br />the pond outslopes and note if rill repair or supplemental <br />seeding is required. <br />7. Record Keeping and Internal Reporting Procedures <br />A written report or form will be kept at the mine site to <br />' document the comprehensive inspections. The report will be <br />reviewed with the Mine Manager if maintenance is required to <br />assure the maintenance is scheduled and performed. <br />8. Consistency with Other Plans <br />This SWMP is a stand alone document and does not depend on <br />' other plans to be complete. A copy of this SWMP will be <br />available at the mine office. <br />' 9. Allowable Non-Stormwater Discharges <br />There are no sources of irrigation return flow, natural <br />uncontaminated spring water, mine drainage, or process water <br />that are combined with stormwater discharges. <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.