Laserfiche WebLink
LJ <br />VI. BURNED WASTE UTILIZATION <br />It is presently not anticipated that any burned coal processing waste or <br />other material or refuse will be removed from the disposal area. If need- <br />ed, a plan would be designed and certified by a registered professional en- <br />gineer and consider the potential hazards which may be created by such re- <br />moval. <br />VII. RETURN TO UNDERGROUND WORKINGS <br />No coal processing waste will be returned to underground wrkings. <br />VIII. NON-COAL WASTE <br />No non-coal waste will be disposed of within the waste disposal area. All <br />solid waste, oil, grease, garbage, and abandoned mining machinery, will be <br />disposed of at the area's county landfill. <br />IX. FINAL ABANDONMENT <br />A registered professional engineer will review the construction processes <br />from the certified reports filed during construction. Final configuration, <br />drainage, and stabilitq will be rechecked at this time. This report will <br />then be certified by engineer at abandonment. <br />Matthew S. Sakurada, P.E. <br />J• <br />