Laserfiche WebLink
'2-.Ah-I:CE 1/~.E1 ~>:~t:o~o~odc ;~~~~ cr at M nco r l '+[olop •11.11721'01 T-[12 ~ GOl/7:/ f•i/' <br />installation relative to the pit excavation(s) sad verifie[ the zlttrty wall wW be 'keyed into" <br />competent bcdroalt. Please respond. <br />9. The May 3, 2005 "Ground Water Modeling Study" provided by Martm and w ocd R eta <br />Consultants. Inc focuses primarily on expected impact/ to the Town of Wanenbetg's wall. In <br />accordance wiW Rule 3.1.6(1). Please quantify the horizontal sad vatic eti~ofth alu ~ 1 <br />(up.g<'adirnt) and shadowing (dow'n-gradient) expected following comp <br />surrounding Phasee 2 &3. Based on the above resulu, piwsc pro",ide n Map or Exhibit which <br />shows the location of any grotmdwater users (welts, springs) and'or stnrcture owners (sepnc <br />tanks, loch f[elds, sewer Lines, basements) within tht extrnt of mounding of shadowing and <br />provide an assessment of the impact to each water use or structure owner. <br />10. The Martin and Wood Ground Wafer Modeling Study strongly recommwds that as much <br />data on the currant water table conditions and yumping data on die Watteabag municipal well <br />be obtained and re>iewed The Division wncura and requezu chat the ppphcant also include <br />atrrcnt water table coadiaotu and pumping data oa any high Production irrigation wc1L• and~or <br />domanc wills within the radius of potential impact. Please provide. <br />