My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE49711
DRMS
>
Back File Migration
>
Permit File
>
500000
>
PERMFILE49711
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:54:36 PM
Creation date
11/20/2007 2:09:08 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2005066
IBM Index Class Name
Permit File
Doc Date
4/6/2006
Doc Name
Adequacy Response
From
Banks and Gesso LLC
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
li-JAN-2006 ~1:76 FROtf•Cosonde Dwuioe of Ylnpolt i ssaicsr •1COIt32t:JS T-102 N.e]!/0:/ f-at <br />6,4.7 E\•TE]E3I1' G - 1t';ter Info <br />3. The ~iiae and Rcclamanu^ Plan ;daps show the locations of five (5) groundw•atcr monitorurg <br />wells and the approxitna[e location of the slurry wall surrounding the Phase 2 ~ 3 Areas. Piease <br />clarify the minimum distance of the moaimring wells from the slum• wall. Please respotrd. <br />4. T'he Division has requested that the Applicant proe•ide basoliae w•uer level data alrtiady <br />collected. in addition, the Applicant will need to demonstrate how they will provide five (5) <br />quartets otbascline w•ata level data from the monitvriag wells prier to exposure oCgrouadwata <br />as the R'attrnber, West Pit. If S quartets of data has not already bern collated, the Applicant <br />may comma to sampling sad submittal of such data prior to exposure of groundwater at 'uc site. <br />Funha, the Applicant wi I) need to describe how the basolrae data collected from the 5 wells w iU <br />be synthesized to establish baseline groundwater elevation(s) prior to exposure of grourtdwata at <br />the site. Please respond. <br />5. In confotmaacc with Rulc 3.1.6(1), please quantify the maximum pumping rate and dw•ation <br />o[ primping expected for de-watering activities in the l0•acre Phase l Area; and qumtify the <br />horizontal and vertical extmt of drawdown expected from dc-w•atcring activities at the time of <br />maximum excavaaon. Lt addition, the Division requesu that the Applicant provtdc a <br />rcpRSmtativc cross-sxtional diagram that shows the Phan 1 Pit at maximum excavation, static <br />groundwatu level and exported drawdowt>, and location of any well or gmundwata user within <br />the radius of drawdowa Finally, baud on the results of the drawdown analysis, pleau• provide <br />a !v$p or Exhibit which shows the leeation(s) of all groundwater users within the ndiw of <br />expocted drawdown during a time of maximum dutu:bmce. The tilap or Exhibit should also <br />include sll available dau on each well such u well completion, well type, well depth, well <br />registration number, pumping rate, baseline water level, etc. Plcaae respond. <br />6. In accordance with Rule 3.1.6(1), please provide an assessmau of possible hydmlvgic impacts <br />to the Bri r~tvn Ditch based on planned de-wetoring activities at the ~Vattrnbag West Ptt <br />information to he included in the assusmmt should include, but not be limited to tl:e fvlowing <br />• Ownership of the ditch. <br />• Is the ditch liaod or unlined? <br />• R'hat is the annual Qow regime of the ditch? <br />• Is the diuh hydrologically corrected to the shallow alluvial aquifer' <br />• Average seepage losses in the reach extending from WCR 4.5 to R'CR fi. <br />• Schemazic sllowvrg the eicwatioa of the ditch, ditch invert, ditch water level, ground <br />surface elevation at Phase L, and groundwater elevation at Phuc 1. <br />~. In accordanee with Rulc 6.4.', (2)(b), please characterize the shallow alluvial aquifer end <br />include a discussion of the direction and rate of groundwater movement in the Watteaherg 1~'at <br />projat area and surounding area Pleau respond. <br />8. In accordance with Rule 6.4.4(f)(i), please verify the maximum depth of excavation and the <br />substrate at the pit borom, ie: shale, clay, clayatone, sandstone, at. In addition, please provide a <br />tepresentaave cross-sectional diagram which shows the width and depth of slum ual! <br />
The URL can be used to link to this page
Your browser does not support the video tag.