Laserfiche WebLink
PI{ASF. 7: 9.3 ACREB <br />MFNINt7 1S TO S'1'AIiT AFTER PHASE B & PI,ANEB TO TAKE TWU (2) <br />YEARS TO M1NF., 2085.3027. <br />PfiASE 8: 1.1.8 ACRF,B <br />MIN [NU 1S'['U STAKT AF!'ER PHAttF. 7 & PLANEB TU TAKE UNE (1) <br />YEAR,4'IY.) PA1NF., 20272028. <br />PFiA.SE A: 20.8 ACREB <br />MINING IS TU S'fAItT AITER PHASE 8 &' PI.ANE6 TO TAKE ONE (1) <br />Y7!;ARS 7'0 MINE, ..'.028-2029. <br />PHASE IU: 20.7 ACRE6 <br />MININU I6 TO ATART AFTER PHABE 9 dr PLANES TO TAKE UNE (1) <br />YF4A.4 Tr) MINE. 2(!~!) 2n~0. <br />ALL DATE.9 ARE DEPENDENT UN MARKET DEMAND. <br />REC[.AMATION WILL AF, DUNE C:ONCUIt1tFSNT1.Y W1TIi MINIP <br />PLEASE SEE EXHIBIT "C" MINING MAP <br />(f) The depth of the deposit Is 5 to 40 feet deep and the stratum immediately <br />beneath the material to be mined is clay /shale. <br />(g) Sand, gravel and road base along with structural fill are the main <br />commodities to be mined There are no other commodities to be mined only <br />construction aggregates <br />(h) Products form this mine site will be used for construction materials as <br />defined by the Division of Reclamation, Mining and Safety as follows <br />"Construction Materials' means rock, clay, silt, sand, gravel, limestone, <br />dimension stone, marble or shale extracted for use in the production of non- <br />metallic construction products. <br />(i) No use of explosives will be used during mining or reclamation <br />