Laserfiche WebLink
(c) Water diversions and impoundments will be done in a way to prevent <br />erosion and sedimentation going into the Highland Canal and Thompson <br />Arroyo Care will be taken while mining to divert the storm water to the earthen <br />berms that wdl be constructed to control the speed of the run off and yet <br />mamtam a flow as regwred <br />(d) The size of area that will be worked at any one time, follows. <br />Phase 1) 26.2 Acres <br />Phase 2) 20.5 Acres <br />Phase 3) 20, 5 Acres <br />Phase 4) 20.7 Acres <br />Phase 5) 20,7 Acres <br />Phase 6) 19.8 Acres <br />Phase 7) 9.3 Acres <br />Phase 8) 11.6 Acres <br />Phase 9) 20.5 Acres <br />Phase 10) 20.7 Acres <br />PLEASE SEE EXHIBIT'C" MINING MAP. <br />(e) All Umes m the Umetable are dependent upon market conditions The <br />mining timetable is as follows. <br />1'!+n,~"r: i 2~j.2 ACRES <br />:; :' ~, ::':' :".INING 1"ALL OF 2(108, AND TAKE FUUR (4) YEARS TU MINE, <br />..te'~,. ~IC) <br />PEASE 2: ?,0.6 ACEiES <br />MINING IS TO START AFTER PEIASE 1 ~t PLANFS TO TAKE THREE (3) <br />YEARS TO MINE, ?.010 2013. <br />PHASF, 3: 20.6 ACRES <br />M1MNl3 IS TO START AFTER PFL9E3E 2 3r YI.ANEB TO TAKE THREE (3) <br />YEARS 7'O M1NE, 20132016. <br />PHASE 4: ?,0.7 ACRES <br />MINING 1S TO START AFTER PHABR 3 & PLANES TO TARE THREE <3) <br />Y FA RS 7'0 ?d I NF., ?,D 16-2019. <br />PFIASY.'u: 2U.7 ACRES <br />M I NI NCI IS TO 9'I'ART AFTER PHASE 4 & FLANES TO TARE THREE (3) <br />YEARS TO MINE, 2018?A22. <br />FHA.4E 6: 19.f3 ACRES <br />MINING IS'1'O BTAR'P A!'1'ER PEFASE 6 dr PI.ANFB'1'O TAKE'1'HRF.E (3) <br />YIs'AR3'f'O ?MINE, 2022.2086. <br />