Laserfiche WebLink
EXHIBIT E <br />Map for mine plan includes: <br />Outline and label of permit boundaries; <br />Labels of names of owners of record within 200'; <br />Structures within 200' (none); surface features-roads, pit boundary, topsoil stockpiles, <br />direction construction material extraction will proceed; location of structures in 200'; <br />Outline and label of existing disturbance adjacent to boundary; <br />Map for reclamation plan includes: <br />Gradient of all reclaimed slopes to describe post mine topography; <br />Where vegetation will not be established/ area for tree/shrub planting; <br />Thickness of replaced overburden; <br />Average thickness of replaced topsoil; <br />