Laserfiche WebLink
Jennifer L. Ashworth, P.E. <br />January 14, 2004 <br />Page 2 <br />The proposed source of replacement for this pit is fully consumable water leased from <br />the City of Longmont and Consolidated Mutual Water Company: The City of Longmont <br />wastewater treatment plant is located approximately 20 miles upstream of this new aggregate <br />operation. A 0.5 percent per mile transit loss (10.0 percent overall loss) has been accounted <br />for in the replacement. The Consolidated Mutua! water will be released from Metro Wastewater <br />Treatment plant, which is located approximately 42.5 miles upstream of the operation. A 0.5 <br />percent per mile transit loss (21.25 percent overall toss) has been accounted for in the <br />replacement. The monthly depletions and replacement requirements are found on the table <br />below. <br />Month/ <br />Year Consumptive <br />Use <br />(acre-feet) Lagged <br />Depletions <br />(acre-feet) 2004 <br />Replacements <br />from <br />Consolidated <br />Mutual <br />(acre-feet) 2004 <br />Replacements <br />from City of <br />Longmont <br />(acre-feet) <br />Sep 03 0.55 0.03 <br />Oct 03 0.15 0.09 <br />Nov 03 0.07 0.09 <br />Dec 03 0.06 0.08 <br />Jan 04 0.06 0.07 0.08 <br />Feb 04 0.08 0.06 0.08 <br />Mar 04 0.11 0.07 0.08 <br />Apr 04 0.11 0.08 0.10 <br />May 04 2.36 0.35 0.44 <br />Jun 04 2.94 1.01 1.28 <br />Ju104 2.98 1.47 1.87 <br />Aug 04 2.61 1.70 2.15 <br />Sep 04 2.20 1.73 2.20 <br />Oct 04 1.63 1.63 0.51 1.37 <br />Nov 04 0.80 1.40 1.55 <br />Dec 04 0.63 1.11 1.23 <br />Total 17.34 10.97 8.79 4.15 <br />