Laserfiche WebLink
• TABLE OF CONTENTS <br />Introduction 7-6e-1 <br />Site Description 7-6e-1 <br />Land Use 7-6e-1 <br />Embankment 7-6e-1 <br />Design Analysis 7-6e-1 <br />General 7-6e-1 <br />Hydrology 7-6e-2 <br />SCS Curve Numbers and "k" Factor 7-6e-3 <br />Precipitation and Storm Type 7-6e-6 <br />Unit Hydrograph and Surface Condition 7-6e-6 <br />Time of Concentration 7-6e-6 <br />Sediment 7-6e-7 <br />Particle Size Distributions 7-6e-9 <br />• Length - Slope Factors (L,S) 7-6e-10 <br />Control Practice Factor (CP) 7-6e-10 <br />Storage Capacity 7-6e-10 <br />Spillway 7-6e-11 <br />Construction Plan 7-6e-14 <br />Site Work Prior to Embankment Construction 7-6e-14 <br />Embankment Design and Construction 7-6e-14 <br />Selected References 7-6e-16 <br />Addendum 7-6e-A - 10-year, 24-hour SEDIMOT II (Input and Output) - 008 <br />Pond <br />Addendum 7-6e-B - 25-year, 24-hour SEDIMOT II (Input and Output) - 008 <br />Pond <br />Addendum 7-6e-C -100-year, 24-hour SEDIMOT II (Input and Output) - 008 <br />Pond - <br />u <br />Paae <br />i <br />