Laserfiche WebLink
-ROM :' Mulletti3iSon's • PHONE N0. 1719783015n • Oct. 05 2000 09:S1RM PS <br />EXIIIBIT D -Mining Plan <br />' otlwi11=6efo~stiip tlie-fApsa~~id.stock<pile along:edge;of Pia ~- <br />'"8iie~5Ttte:firea°-will be:blasted:bv, Sonthi3r.~~Const;nnction. <br />(b) The area will be stripped with a loader and stockpiled <br />(c) All overland water flow will be captivated in site. Water will perk down <br />within two days <br />(d) Area [o be worked at one lime will be approximately 25' deep, 100' wide, <br />400' tong <br />(e) Time table <br />a. Each mining phase is estimated to be approximately 90 days <br />b. Area to be worked at one time will be approximately 25' deep, <br />100' wide, and 400' long. <br />c. Sequence of mining stages will begin at point B and continue <br />towards point A as seen on Exhibit C Mining Plan Mep page '~ <br />(~ <br />(i) Depth of the deposit to be mined is 25'; type of overburden is <br />rangeland topsoil <br />(ii) Nature of stratum beneath material to be mined is limestone <br />(f) Pranary commodity to be mined is Class # 6 road base <br />(g) All intended use of all expec[ed products to be mined by proposed <br />operation: to be used for road maintenance <br />5 <br />