Laserfiche WebLink
<br />EXHIBIT B - MINING PLAN <br />~~ <br />Prior t~~ excavation of grave all stripable top soil will be stockpiled <br />for rec:Lamation purposes. E avation will begin at the southerly end of <br />the project site (stationing l~0) and will proceed northerly. The first <br />year excavation should reach stationing 3+50, and the remaining in the <br />following year. <br />The flat. area in the southeasterly corner is an existing gravel pit. <br />Texas Creek Gravel Pit is a proposed enlargement of the existing small pit. <br />Methods of excavation will be with a front-end loader and dozer with an <br />on-site gravel crusher. Crusfied gravel will be stockpiled on previously <br />excavated areas within the site and will be removed by dump truck upon time <br />of sale or time of use by the applicant. <br />Application for Mining and <br />Reclamation Permit - <br />Spillers Construction <br />Texas Creek Gravel Pit <br />